Compliancemanzill.com
ISO/IEC 27002:2022

ISO/IEC 27002:2022/Physical controls/53 of 93

7.8Equipment siting and protection

Control family: Physical controls

Control description

Control type: #Preventive

Information security properties: #Confidentiality #Integrity #Availability

Cybersecurity concepts: #Protect

Operational capabilities: #Physical_security #Asset_management

Security domains: #Protection

Control:

Equipment should be sited securely and protected.

Purpose:

To reduce the risks from physical and environmental threats, and from unauthorized access and damage.

Guidance:

The following guidelines should be considered to protect equipment:

a) siting equipment to minimize unnecessary access into work areas and to avoid unauthorized access;

b) carefully positioning information processing facilities handling sensitive data to reduce the risk of information being viewed by unauthorized persons during their use;

c) adopting controls to minimize the risk of potential physical and environmental threats [e.g. theft, fire, explosives, smoke, water (or water supply failure), dust, vibration, chemical effects, electrical supply interference, communications interference, electromagnetic radiation and vandalism];

d) establishing guidelines for eating, drinking and smoking in proximity to information processing facilities;

e) monitoring environmental conditions, such as temperature and humidity, for conditions which can adversely affect the operation of information processing facilities;

f) applying lightning protection to all buildings and fitting lightning protection filters to all incoming power and communications lines;

g) considering the use of special protection methods, such as keyboard membranes, for equipment in industrial environments;

h) protecting equipment processing confidential information to minimize the risk of information leakage due to electromagnetic emanation;

i) physically separating information processing facilities managed by the organization from those not managed by the organization.

Other information:

No other information.

How to implement

Coming in phase 2Step-by-step guidance for implementing this control on Microsoft Azure, using services such as Azure Policy, Microsoft Defender for Cloud and Entra ID. It will be matched to your environment.